Sunfire-HyLink Alkaline

RWE – Ramping up the First Industrial-Scale Green Hydrogen Plant

Status:
Operation

Sunfire-HyLink Alkaline | 10 MW

  • 10 MW pressurized alkaline electrolyzer ​
  • Up to 200 kg/h green hydrogen
  • Commissioned in 2024​
  • Lingen, Germany

Hydrogen for Industry

  • RWE’s “Growing Green” strategy aims to build at least 2 GW of electrolysis capacity to produce green hydrogen by 2030¹⁾
  • Sunfire’s electrolysis technology at the RWE site is part of the GET H2 lighthouse hydrogen project​

1) Source: https://www.rwe.com/presse/rwe-ag/2021-11-15-rwe-startet-investitions-und-wachstumsoffensive/

All images ©: RWE

  • »In Sunfire, we've partnered with a strong German electrolyzer manufacturer. The plant will provide us with valuable insights for deploying this technology in future large-scale hydrogen production projects.”«
    Dr. Sopna Sury
    COO Hydrogen – RWE Generation
Sunfire-HyLink Alkaline I 10 MW

RWE

  • Location
    Lingen, Germany
Cases

More References

Sunfire Electrolyzers

Explore Our Product Portfolio