RWE – Three-Digit MW Electrolyzer for One of Europe’s Most Powerful Electrolysis Plants
Status:
Manufacturing
Sunfire-HyLink Alkaline | 100 MW
100 MW pressurized alkaline electrolyzer
Up to 1900 kg/h green hydrogen
Lingen, Germany
Hydrogen for Industry
Long-term H2 purchase agreement between RWE & TotalEnergies with ca. 30,000 t annually
H2 via pipeline for industry offtakers, e. g., refineries or steel works
Offshore wind parks supply sustainable electricity
RWE is working to install 300 MW of H2 generation capacity at Lingen site Source: https://www.rwe.com/presse/rwe-ag/2021-11-15-rwe-startet-investitions-und-wachstumsoffensive/
Sunfire’s technology is part of the GET H2 Nukleus initiative.
»After Sunfire has already provided an electrolyzer for our pilot plant in Lingen, we are looking forward to continuing this collaboration as part of the GET H2 nucleus project. With Sunfire's electrolyzer, the GET H2 nucleus will reach its full production capacity in 2027. At the same time, we are expanding our technology portfolio with an alkaline electrolyzer in the three-digit megawatt range.”«